Gantt chart: what it is and how to read one

Also known as: Project timeline · schedule chart

A Gantt chart is a project schedule drawn as bars: each task takes one row, and its bar starts and ends on its planned dates.

How to read it

  • The rows are the tasks or jobs, often grouped into phases.
  • The horizontal axis is time: days, weeks or months.
  • The length of each bar is that task’s planned duration.
  • The arrows between bars are the dependencies: what cannot start until something else finishes.

An example

Remodeling a store: demolition from the 3rd to the 7th, electrical and plumbing from the 10th to the 21st, painting from the 24th to the 28th. If electrical and plumbing slip a week, the Gantt chart shows at once that painting moves with them, and so does the handover.

What a Gantt chart does not tell you

Whether there are people to do it. A Gantt chart can look perfect and be impossible, because the same person appears on three bars at once. That is why you read it alongside resource utilization.

The usual mistake

Drawing it once and never touching it again. A Gantt chart that does not reflect what happens is a picture of day one. And without a saved baseline, when dates move there is nothing to compare them with.

Keep reading

Related terms

Projects

Baseline

Project baseline · schedule baseline

A baseline is the saved copy of a project’s approved plan, with its dates and durations. It lets you compare what was planned with what is actually happening at any time.

Projects

Task dependencies

Finish-to-start · predecessors

Task dependencies are the rules that tie the start or finish of one task to another, such as painting not starting until the plaster has dried.

Projects

Resource utilization

Team workload · utilization rate

Resource utilization is the share of each person’s available hours that is already committed to planned work, measured by day, week or month.

On the blog

See all 53 glossary terms

Request a demo

Shall we look at it with your data?

We will show you how what you just read works in attendo, with your own assets, tickets and customers. If it is not a fit, we will tell you.

  • With your operation, not a generic demo
  • A real person from our team replies
  • No cold calls afterwards

Would you rather talk first?

Which area do you want to see in the demo?

With your work email we prepare the demo around your case.

In one or two sentences.

If you chose Maintenance (CMMS)

If you chose Field work (Field Service)

If you chose Facility Management

If you chose any other area

Only if you would rather we call you.

Data protection. Controller: AxisOne Group SL. Purpose: preparing the demo you request and replying to you. Legal basis: your consent and the request you make. Recipients: we do not disclose your data; Cloudflare (website) and Brevo (email notices and confirmation) process it on our behalf. Rights: access, rectification, erasure, objection, restriction and portability, at privacy@attendo.me. More information in the privacy policy.

What happens when you send it. Someone from our team reads what you tell us and writes to you to agree on a time for the demo. Our hours: Monday to Thursday 9:30 AM to 6:30 PM and Friday 9:30 AM to 2:30 PM, Spain time.