Engineering and projects

Projects measured as they move forward

Plan with a Gantt chart and a baseline, approve every change with its impact and track the cost of each line item live. All in the same documents.

The problem

Projects, changes and revisions with approval

Planning lives in a separate Gantt chart, changes are approved by email and nobody knows which drawing revision is the right one. The project margin shows up at month-end close.

Processes you set up in attendo

  • Projects with sections and line items, and a Gantt chart with dependencies, baseline and actual progress
  • Live project cost: hours at their rate, expenses and materials charged to each line item
  • Engineering change requests with their impact on schedule and cost, and approval by link
  • Drawing and document revisions with statuses, a reviewer and recorded approval
  • Deliverables as tasks with a date and an owner, visible on the team calendar
  • Import of budgets in BC3 format from Presto or Arquimedes

Ready to go: attendo Projects It adds team workload, logged hours and costs, shared whiteboards and the handover to maintenance. See attendo Projects

How it is set up

A typical process, step by step

With document types, flows and checklists you configure without code.

  1. Step 1

    You plan

    You import the budget or create sections and line items. You set the baseline and the Gantt chart draws the dependencies.

  2. Step 2

    You execute

    Hours, expenses and materials are charged to each line item. Actual progress is compared with the baseline.

  3. Step 3

    You change with control

    Each change is a document with its impact on schedule and cost. The approver signs off from their phone, with a code.

  4. Step 4

    You measure the margin

    The running cost is visible without waiting for month-end close. The workload view tells you who is overloaded before you commit to another date.

Frequently asked questions

Frequently asked questions

Does the Gantt chart work on mobile?

No, on purpose. The Gantt chart and the editors are used on desktop. On mobile you work on tasks, hours and checklists.

Can I import my budget from Presto?

Yes, in BC3 format. It is worth testing with one of your own files before starting the project.

Does it keep every version of each drawing?

Each revision is attached to its document with its date and author, and the status shows which one is approved. attendo is not a CAD file manager.

Request a demo

Tell us about your process

We will show you how the engineering and projects process you want to organize looks in attendo, with your document types and your approvals.

  • With your operation, not a generic demo
  • A real person from our team replies
  • No cold calls afterwards

Would you rather talk first?

Which area do you want to see in the demo?

With your work email we prepare the demo around your case.

In one or two sentences.

If you chose Maintenance (CMMS)

If you chose Field work (Field Service)

If you chose Facility Management

If you chose any other area

Only if you would rather we call you.

Data protection. Controller: AxisOne Group SL. Purpose: preparing the demo you request and replying to you. Legal basis: your consent and the request you make. Recipients: we do not disclose your data; Cloudflare (website) and Brevo (email notices and confirmation) process it on our behalf. Rights: access, rectification, erasure, objection, restriction and portability, at privacy@attendo.me. More information in the privacy policy.

What happens when you send it. Someone from our team reads what you tell us and writes to you to agree on a time for the demo. Our hours: Monday to Thursday 9:30 AM to 6:30 PM and Friday 9:30 AM to 2:30 PM, Spain time.