Resource utilization: who is overloaded before you promise a date

Also known as: Team workload · utilization rate

Resource utilization is the share of each person’s available hours that is already committed to planned work, measured by day, week or month.

How to calculate it Utilization = planned hours ÷ that person’s available hours in the period

Available hours are not eight a day

They are the hours of each person’s actual schedule: minus the holidays on their calendar, vacation and time off. Measuring against a flat eight hours gives an optimistic figure that never holds.

An example

A technician has 32 available hours this week, because Thursday is a holiday, and 40 hours assigned across three projects. Her utilization is 125%. Before you promise a date to a fourth customer, something has to move.

How to read it

  • Above 100%: overbooked. Something will be late.
  • Close to 100% for weeks: there is no room for the unexpected, and the unexpected always shows up.
  • Very low: either there is spare capacity or there is work nobody is planning.

The usual mistake

Looking at it only for the team as a whole. A team at 80% can have one person at 140% and another at 20%. The average hides exactly the bottleneck that delays projects.

Keep reading

Related terms

Projects

Gantt chart

Project timeline · schedule chart

A Gantt chart is a project schedule drawn as bars: each task takes one row, and its bar starts and ends on its planned dates.

Projects

Timesheet

Time entries · project time tracking

A timesheet is the record of the time each person spends on each project, task or customer, used to know what each job costs and what is billable.

Projects

Task dependencies

Finish-to-start · predecessors

Task dependencies are the rules that tie the start or finish of one task to another, such as painting not starting until the plaster has dried.

On the blog

How to track time on projects without your team hating it

Asking a team to log their hours usually sounds like surveillance. And when it happens on Friday, from memory, the data is useless. It can be done in a way that costs little and pays off, including for the people logging.

4 min read

See all 53 glossary terms

Request a demo

Shall we look at it with your data?

We will show you how what you just read works in attendo, with your own assets, tickets and customers. If it is not a fit, we will tell you.

  • With your operation, not a generic demo
  • A real person from our team replies
  • No cold calls afterwards

Would you rather talk first?

Which area do you want to see in the demo?

With your work email we prepare the demo around your case.

In one or two sentences.

If you chose Maintenance (CMMS)

If you chose Field work (Field Service)

If you chose Facility Management

If you chose any other area

Only if you would rather we call you.

Data protection. Controller: AxisOne Group SL. Purpose: preparing the demo you request and replying to you. Legal basis: your consent and the request you make. Recipients: we do not disclose your data; Cloudflare (website) and Brevo (email notices and confirmation) process it on our behalf. Rights: access, rectification, erasure, objection, restriction and portability, at privacy@attendo.me. More information in the privacy policy.

What happens when you send it. Someone from our team reads what you tell us and writes to you to agree on a time for the demo. Our hours: Monday to Thursday 9:30 AM to 6:30 PM and Friday 9:30 AM to 2:30 PM, Spain time.